Case Study Category: Healthcare

  • Pallet Racking Dismantle & Safe Removal

    Pallet Racking Dismantle & Safe Removal

    • Safe Working at Height – All dismantling at height was conducted using scissor lifts with trained operatives following UK Shelving’s working at height procedures.
    • Controlled Removal of Mesh and Sprinkler Systems – Troax mesh panels and sprinkler systems were removed systematically, ensuring no damage to pipework or surrounding structures. Water from the system was safely contained and cleared to maintain a dry workspace.
    • Deconstruction & Stacking – Beams and frames were dismantled carefully using pump trucks and hand tools, then stacked securely within designated storage areas for removal.
    • Site Clean-Up & Handover – Once the racking was removed, the area was fully cleared, all equipment off hired, and the project signed off with the client.
    • Health & Safety – Safety was central to every stage of this project. Our operatives followed strict PPE requirements, clearly setup exclusion and working zones, and all tools (including those for hot works) were PAT tested and used by competent staff.